We do a lot of tracker and varitrac in our office and they are not difficult to set scheduling in if you follow the manual. It is just really time consuming setting them up because of the way they are set up in the display. If you follow the manual scrooloose sent you it should be no problem. Some of the comments were correct in that usually these panels are installed by mechanical contractors we rarely sell them in Trane contracting for a job. Our sales dept. is usually pretty good in adding in a little cost to the mechanical contractor for me to go out and spend a little time showing them how to use it and make sure it is set up properly to hopefully stop this kind issue.
-
06-27-2012, 07:15 PM #28
Professional Member
- Join Date
- Sep 2010
- Location
- Southern California
- Posts
- 55
I think I may have mislead or mispoke some where in my rant. Our sales guy gave us all the manuals, he even came out and did the one on one. He is a good guy. I understand how to set up schedules, exceptions and even use the rover tool, but I was told that if the units are not put into a schedule, they run constantly in occupied mode, I was also "NOT" told that he teaches classes and he kind of kept purposely forgetting to get me info on up comming classes, what is up with that? My only question was "Is there a way to stop the units from running, without manipulating the existing schedule?"
-
06-27-2012, 09:05 PM #29
Turn the power off? Just kidding.

The unit will run from the start time to the stop time in the schedule. So if you want the units to turn off you need to either modify your existing schedule to not start, or add an exception to the schedule to have them not start.
That is the purpose of the schedule, to tell the units when to run.
Is that answering the question you have or am i missing it still?
-
06-27-2012, 11:08 PM #30
Professional Member
- Join Date
- Sep 2010
- Location
- Southern California
- Posts
- 55
Lol, I did that way back in the thread, know we know who didn't read the whole thread! Just kidding with you, thanks for the info, but I did that a while ago, if you read early in the thread that's why I was pissed, I thought the sales guy was bs'ing me when he said that was the only way.
P.S. In another part of the thread I said, "I was on the verge of just going to the roof, and throwing all the switches."
-
06-28-2012, 12:43 AM #31
one last question than im done..do you have a computer front end and can see the unit graphics? is there a point that shows fan ON/OFF. can you fix the fan point off? the fan should not run if it fixed off.
-
06-28-2012, 09:07 AM #32
Professional Member*
- Join Date
- Aug 2009
- Location
- Prattville,Alabama
- Posts
- 1,138
Scrooloose, when I first saw this post I thought your first paragraph was directed at me. On second look, I'm not sure. Regardless, to you and all others on this thread: It was never my intent to rant or bash on anybody or any equipment. I was merely trying to tell the OP why I can understand his frustation, and perhaps explain a reason for it. I neglected to state that "reason" may or may not apply to his local office (though it appeared it could). I also do not participate in bashing, and I'm embarrassed to think I may appear to have done so here.
-
06-28-2012, 09:21 AM #33
Professional Member*
- Join Date
- Aug 2009
- Location
- Prattville,Alabama
- Posts
- 1,138
Before my old office started up an ICS department, I was assigned duties with the (I think) first generation VariTrac and Tracker. When main panels were brushed steel(?), with no operator interface, and all comms with them were done through a laptop. At least with VariTrac, don't remember what Tracker was like then. I had some kind of Radio Shack "Tandy" brand, that was recommended by Trane. 6 or 7 lines of text was all the screen that laptop had! Man, feeling some of those years now. I remember once when all the text on the screen looked like Greek, literally! Called tech support, and after several minutes of trying one thing after another, he asked "is caps lock on?" My reply: "huh, whats that?" I had never learned to type, and this was the first computer I had ever seen! Anyway, that was the problem, and I remember a few months later a service bulletin was issued on that very thing! My legacy with Trane, after 25 years!
-
06-28-2012, 11:12 AM #34
Professional Member
- Join Date
- Sep 2010
- Location
- Southern California
- Posts
- 55
Thanks to all of you guys, I got the answer to my main question. You have to set a start and stop time, and have the unit in a schedule in order to shut it off. Why not just give us an OFF option and be done with it? I swear I like our Carrier i-Vu a lot better.
Now my second question; Why are they acting like the CIA with the controls classes, our money not green enough?
-
06-28-2012, 12:11 PM #35
If you like Carrier you would LOVE AutomatedLogic's WebCTRL. WebCTRL is like i-VU on steriods.
The reason the units continue to run is because they are LON based. On LON units, to occupy a unit the control system sends a enumerated value of zero. Which is the default value in the unit. And sends an enumerated value of one to Unoccupy the unit. So if you never put a schedule in place the units will run on the default which is occupied. This is actually considered a good feature because if the control system goes wonky you could just unplug the communication trunk and the units would run in a pinch. You might have to power cycle the units but they will run by default.You can easily judge the character of a man
by how he treats those who can do nothing for him
-James D. Miles
-
06-28-2012, 12:35 PM #36
Professional Member
- Join Date
- Sep 2010
- Location
- Southern California
- Posts
- 55
"FULLY MAN, THAT'S what I'm talking about!". (In my Brian from "Half Baked" voice)
I thank you for that, great "Holder Of Controls Knowledge".
-
06-28-2012, 05:25 PM #37
-
06-30-2012, 08:22 AM #38
Professional Member
- Join Date
- Jan 2012
- Location
- Central New Jersey USA
- Posts
- 60
I haven't been on a Tracker in some time. Did they give you the operating software for a PC?
When you have had enough, you can see if they have the reliatel board in them that accept a conventional T stat. You can use a Viconics communicating thermostat and use Bacnet or Lon and a front end as another option.
Trane doesn't like to play in anyones sandbox. Where I come from-they will not sell Tracer software to contractors. Good luck.
-
07-02-2012, 04:44 PM #39
Professional Member
- Join Date
- Sep 2010
- Location
- Southern California
- Posts
- 55
As much money as we've spent with them over the last few years on two new buildings with 90+ units, we wouldn't let them say no, lmao. Gave us the lite version of the software, I don't know how to commission units yet so I didn't care at first. But since I've been studying a bit and learning the tracker system, I think I need to learn as much if not more about Lon, as I know about Bacnet. They slipped up and sold us the Rover Tool with full software, even though we were told it would be the lite version.