    New Trane RTAC Chiller Installation

    A few weeks ago we changed out a old Carrier Flotronic Chiller to a new Trane RTAC Chiller. We also removed the single split case pump, and installed 2 pumps. We also programmed the control system to control the pumps in a lead lag type control sequence. We had to complete this job in two days. We started on a friday night, and finished by 6 pm on saturday.
    Attached Images Attached Images         
    J. King

  2. #2
    Join Date
    Sep 2005
    Posts
    155
    Very Nice!

  3. #3
    Join Date
    Mar 2007
    Posts
    3,108
    It looks nice for a two day turnkey replacement. It's obvious that the guys who actually did the work take pride in what they do, but it also looks like you had a low budget property manager at the helm. Those are the places you usually see old carrier recip single chiller/single pump, no redundancy, building full of menopausal women, and no money to do it right the first time! The piping leaves a lot to be desired, IMO... Whoever laid it out has obviously never had to actually work on these things, cause they blocked 50% of the service access. No fault for the field guys who got it done... The people who make these decisions rarely have to deal with the consequences of their oversights. Hopefully that chiller has control of the pumps, as well. Pump control is much more important with that new chiller than it was with the old Carrier DX chiller.

    It's very nice to see pictures of this kind of equipment on the W.O.P. Thank you for posting.
    Last edited by Tech Rob; 05-20-2012 at 11:34 PM.
    "There is no greater inequality than the equal treatment of unequals."

    -Thomas Jefferson

  4. #4
    Join Date
    Jan 2009
    Location
    Not in Iran
    Posts
    1,093
    Quote Originally Posted by Tech Rob View Post
    It looks nice for a two day turnkey replacement. It's obvious that the guys who actually did the work take pride in what they do, but it also looks like you had a low budget property manager at the helm. Those are the places you usually see old carrier recip single chiller/single pump, no redundancy, building full of menopausal women, and no money to do it right the first time! The piping leaves a lot to be desired, IMO... Whoever laid it out has obviously never had to actually work on these things, cause they blocked 50% of the service access. No fault for the field guys who got it done... The people who make these decisions rarely have to deal with the consequences of their oversights. Hopefully that chiller has control of the pumps, as well. Pump control is much more important with that new chiller than it was with the old Carrier DX chiller.

    It's very nice to see pictures of this kind of equipment on the W.O.P. Thank you for posting.


    That piping is hugging the machine pretty tight ! I agree!
    no signature blast'em man blast'em
    !!!KILL THE TERRORIST!!!

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Comfortech Show Promo Image

Related Forums

Plumbing Talks | Contractor Magazine
Forums | Electrical Construction & Maintenance (EC&M) Magazine
Comfortech365 Virtual Event