I cannot believe that someone out there actually put a 5 and a 3 together to make a 7.5, wrapped it with duct tape, charged the customer and can sleep at night !
-
04-21-2012, 07:51 AM #2
Professional Member*
- Join Date
- Dec 2002
- Location
- SouthEast NC ICW & Piedmont Foothills
- Posts
- 7,218
it's done everyday, they certainly could have done a more professional application
so, how did you leave it?
It`s better to be silent and thought the fool; than speak and remove all doubt. 
-
04-21-2012, 08:08 AM #3
As long as it's wired in parallel, no problem. 8 mfd should be fine short term, but I would replace it with a 7.5. The duct tape is a nice touch.

I find electrical connections taped with duct tape.
No wire nuts, just duct tape!
-
04-21-2012, 09:46 AM #4
Professional Member*
- Join Date
- Apr 2011
- Location
- Coastal Maine
- Posts
- 565
I agree with the others, that this is done all over the country, everyday. There is nothing wrong with grouping capacitors to get out of a jam. We are in a very rural area, and can be an hour or more from a supply house, so sometimes it is your only choice.
That being said, it could have been done in a much more professional manner.
-
04-21-2012, 09:49 AM #5
Looks a bit like the Run Cap Bandit has been there, but he would have left the caps in the box, so maybe not.
-
04-21-2012, 10:26 AM #6
Professional Member
- Join Date
- Jul 2010
- Location
- So-Cal
- Posts
- 533
I've been in this business a long time and have not seen this done before here in the So-Cal area. Went to visit some relatives in Tennessee and was checking their A/C when I was there and that's the first time I seen a set up like that.
So i think its like meplumber said its more in rural areas where the parts house is not close.
-
04-21-2012, 10:45 AM #7
Professional Member
- Join Date
- Mar 2011
- Location
- Jamestown,SC
- Posts
- 45
Yeah, I have put 2 together to get the customer by over a weekend or whatever the case may have been, but the tape had been on here so long it had started to deteriorate. Don't know if it really matters but the caps were upside down too, I like to put them in terminal side up. If nothing else it looks professional and that is what the customer is paying for.
-
04-21-2012, 10:47 AM #8
Professional Member*
- Join Date
- Dec 2002
- Location
- SouthEast NC ICW & Piedmont Foothills
- Posts
- 7,218
caps wired in parallel = total of cap values
caps wired in series = approximately 1/2 of each in series
will dredge formula out later
bottom line is: just because you've never sen it doesn't mean it's not allowed/permissable/accepted
that's why if you're not learning something new, you're probably dead
It`s better to be silent and thought the fool; than speak and remove all doubt. 
-
04-21-2012, 11:22 AM #9
There is nothing wrong with wiring capacitors in parallel to add up to the value needed, but there is a lot wrong with how those were mounted.
If more government is the answer, then it's a really stupid question.
-
04-21-2012, 12:09 PM #10
Member
- Join Date
- Jun 2003
- Location
- Virginia
- Posts
- 376
Definately not my first choice for replacement caps, but I have done it many many times when the supply house is miles away. And I wouldn't mount them that way either, but the concept is very acceptable.
As a matter of fact, I believe it was demonstrated in some of my old traning manuals.
-
04-21-2012, 12:27 PM #11
Professional Member
- Join Date
- Mar 2011
- Location
- Jamestown,SC
- Posts
- 45
ok, now I know it is ok to wire caps like that. Would like to see the formula for series and parralel wiring. I had never seen or heard anyone ever say it was ok, so I ASSumed it was wrong, Thanks for lernin me something, ha ha.
-
04-21-2012, 12:48 PM #12
ugly hackery. Takes the professionalism right out of what we do, surprised he didn't have a 7.5 (I have at least 4) but did have a 3mfd.....I may have 1 or 2......anyway, what is embarrassing is opening up a panel like that and the homeowner asks you if that mounting was 'correct'. My answer is no. I have strap and drill tips in my toolbag and will secure those even on a maintenance. I want them to know that I am there to make sure their system is ok. I work for them, ultimately. Nice picture.

-
04-21-2012, 02:05 PM #13
Regular Guest
- Join Date
- Apr 2012
- Location
- Jamestown NC
- Posts
- 10
Professionalism is not a word that is used very often in HVAC. Its hard to maintain a positive outlook on what we do when over half the industry are all hacks. They make the same money per call we do and the end result looks like this picture shown above. Most customers complain over price so they call they guys who do this level of work. If you do not posses a inner drive to do a good job this industry will often not inspire it. (Present readers excluded)