I handle multiple site's where Quest control's is starting to monitor,run,and alarm the site's. I was told that to get the AC unit's at 100% capacity just to jumper out the RTU controller's (T-Stat's). I find this unacceptable and the manual's I have show the dip switch setting's only going down to 70 degree's default setting all dip switch's in the off position??? Some are maintaining at 68. Any advice? Blowing on the sensor is a pain also