03-10-2012, 08:19 PM #14[Avatar photo from a Florida training accident. Everyone walked away.]
2 Tim 3:16-17
RSES Certificate Member
AOP Forum Rules:
-
03-10-2012, 09:03 PM #15
Professional Member
- Join Date
- Dec 2011
- Location
- bedford ind
- Posts
- 1,080
I will be glad too. It seems it had something to do with lightening charging a gas line then duct work.
-
03-10-2012, 09:13 PM #16[Avatar photo from a Florida training accident. Everyone walked away.]
2 Tim 3:16-17
RSES Certificate Member
AOP Forum Rules:
-
03-10-2012, 09:16 PM #17
Professional Member
- Join Date
- Dec 2011
- Location
- bedford ind
- Posts
- 1,080
I don't remember, but it seems like we were talking about bonding and grounding csst. I'm trying to remember. I'll call my son-in-law tomorrow to see if he remembers. It may have been a csst booklet I read.
-
03-10-2012, 09:21 PM #18[Avatar photo from a Florida training accident. Everyone walked away.]
2 Tim 3:16-17
RSES Certificate Member
AOP Forum Rules:
-
03-10-2012, 09:37 PM #19
Professional Member
- Join Date
- Dec 2011
- Location
- bedford ind
- Posts
- 1,080
Ralph morrison touches on the topic in his book Grounding and shielding/circuits and interference.
-
03-11-2012, 07:00 AM #20
-
03-11-2012, 10:02 AM #21
Old days? That is what is required again now in all the areas I work in. Insulated hard duct. I had one job where they wanted a second system installed in the attic for a/c only. I figured the hard pipe and insulating it all by hand added probably 20 hours to the job or more plus the material extra cost.
-
03-13-2012, 07:04 PM #22
Professional Member
- Join Date
- Dec 2011
- Location
- bedford ind
- Posts
- 1,080
couldn't find the info I was looking for, but did find some material in Tru-flex metal hose corp. installation training guide, that states, and I quote
"Even a nearby lightening strike that does not strike a structure directly can cause metallic systems (such as wiring, piping and ductwork) in the structure to become energized.If those systems are not properly bonded, the difference in potential between the systems may cause the charge to arc from one system to another and cause damage to to csst. End Quote.
Which makes me wonder about the bonding and grounding of the complete system , especially if vibration dampening legs are used on the furnace.Not all furnaces I have seen installed have ground wire.
Also if csst requires # 6 ground, I'm rethinking how a metal duct system should be bonded or grounded, or if it should be.