    Ok. Let's talk here. We do paging here to cell...

    Ok. Let's talk here. We do paging here to cell phones through our Microsoft Exchange server. So we email to our cell phones the alarm information. We have been doing this for several years. We...
  2. Replies
    37
    Views
    7,133

    We called in a motor rebuild specialist. The...

    We called in a motor rebuild specialist. The bearings were the failure. All the grease was out of the bearing. We now buy a new condenser fan motor and send it to be rebuilt with sealed bearings. ...
  3. Replies
    4
    Views
    177

    We run 430 and have done this quite a bit. It is...

    We run 430 and have done this quite a bit. It is controlled by your license as stated. Check your Server License Details--Options.
  4. Replies
    17
    Views
    625

    260

    Mine came the first day on the job. August 2, 1971.
  5. Replies
    17
    Views
    625

    Like testing capacitors

    Like testing capacitors
  6. Replies
    17
    Views
    625

    I use a Simpson 260.

    I use a Simpson 260.
  7. Replies
    9
    Views
    587

    Sounds like a really good, conscientious firm. I...

    Sounds like a really good, conscientious firm. I think anyone would be proud to work there.

    Mike
  8. Replies
    9
    Views
    587

    Naw, you're really right. I retired from HW in...

    Naw, you're really right. I retired from HW in 2003 and that's the way it was then for the branch guys. Local HW guys tell me that now it still hasn't changed. 10 years before I left, I got on...
  9. Replies
    9
    Views
    587

    The job description reads like you are really...

    The job description reads like you are really looking for a construction project manager techineer!! All 3 positions rolled into 1. Hard to find people for each position let alone 3 in one.
    ...
  10. Replies
    19
    Views
    1,602

    ?

    ?
  11. Probably cheaper in the long run.... LOL

    Probably cheaper in the long run.... LOL
  12. I believe that Honeywell has a very good...

    I believe that Honeywell has a very good reputation in Indian. Check with Tata Honeywell.
  13. Replies
    18
    Views
    1,264

    I agree. Apparently the xfmr will not put out...

    I agree. Apparently the xfmr will not put out any voltage with a load on it. In fire alarm systems, many power supplies do this. It's called "foldback". I doubt if you have this type of xfmr. ...
  14. What also is needed here for a dual duct system...

    What also is needed here for a dual duct system is a reversing relay to the other side of the box. Signal to one actuator, reversed signal to the other. Dual duct systems are the most expensive...
  15. Replies
    4
    Views
    1,382

    Make me an offer.

    Make me an offer.
  16. 3 wires is not needed. Please see this IEEE...

    3 wires is not needed. Please see this IEEE paper from IEEE organization. If you do use a 3rd conductor the potential of grounding all panels creating ground loops. The 3rd wire is NOT used for...
  17. Replies
    4
    Views
    1,382

    Thought I would add a link to the product IOM and...

    Thought I would add a link to the product IOM and specification manual.
    http://www.veris.com/docs/Installs/h81xx_i0f2.pdf
    This is not from me but it is much appreciated.
  18. Replies
    4
    Views
    1,382

    Veris energy monitors

    Does anyone need Veris energy monitors? Model number H8163 0800-3--3? Veris H8163-CB? Veris 8920-3? With CT's. some other current ranges. Very reasonably priced. Oldhweller.
  19. I hold a patent in this area. What you say is...

    I hold a patent in this area. What you say is absolutely true. The twist is what makes the difference. Thanks. Oldhweller
  20. Controls Technician needed in Indianapolis

    I am not a recruiter. I need this technician for my department.



    CONTROLS TECHNICIAN

    Whether its doing routine maintenance on the fire panel in the Tiger exhibit, running electrical...
  21. Replies
    32
    Views
    5,387

    Just as soon as you touch it, you've bought every...

    Just as soon as you touch it, you've bought every problem that panel had in the past. Document with pictures and before you start have the customer signoff on these panels for your protection---CYA
  22. BS!!!! Freedom and democracy are the most...

    BS!!!! Freedom and democracy are the most important.
  23. AMEN

    AMEN
  24. AMEN

    AMEN
  25. Replies
    1
    Views
    562

    I have a spare XL15b, if you need it. Thanks. ...

    I have a spare XL15b, if you need it. Thanks. Mike
  26. Replies
    5
    Views
    870

    Correctamundo

    Correctamundo
  27. Replies
    424
    Views
    23,850

    Seems like Kefah has disappeared from the thread,...

    Seems like Kefah has disappeared from the thread, leaving us to argue among ourselves.
  28. Replies
    65
    Views
    11,295

    Use your database backups and install on another...

    Use your database backups and install on another computer
  29. Thread: LON

    by oldhweller
    Replies
    12
    Views
    1,647

    Do either of these devices have active biasing...

    Do either of these devices have active biasing resistors? That is, pull-up and pull-down resistors to the the rail voltages? Add a small 12v DC power supply with 10k ohm resistors to the + and -...
  30. Replies
    7
    Views
    2,250

    Because we have a service contract with HW for...

    Because we have a service contract with HW for just this thing, HW installs the service packs. We both work together to make sure no problems arise. We have XL50s,Xl500s,XL800s,XL10(of various...
  31. Replies
    7
    Views
    2,250

    We have access to our HW techs and they have...

    We have access to our HW techs and they have TAC(Techanical Assistant Center support). Very seldom do we have to go past them. I used to work in TAC on this product, and the HW techs have known me...
  32. Replies
    7
    Views
    2,250

    EBi support

    We are an EBi customer and support ourselves. Yes there are questions we have, but our service contract covers this. No equipment covered. Where are you located? Thanks. Mike
  33. Replies
    7
    Views
    1,506

    Honeywell

    Huge amounts of documents available. We just need to know what controller. If it is XL500-5000 series, do you have CARE? If not you're SOOL!!!:gah:
  34. Replies
    5
    Views
    1,389

    cascade

    Are you using the Modbus interface or is the system standalone? There are 2 options for cascade. Each has a different sequence. Check the literature. I have several of these setups and they work...
  35. Replies
    20
    Views
    5,719

    EBi/Symmetre

    You obviously don't have any idea what you're talking about. If you've never done any EBi systems, you should not say anything.

    :censored:
  36. Replies
    3
    Views
    722

    AMEN

    Having worked for them I agree.
  37. Replies
    1
    Views
    676

    Fujitsu mini-split

    I have a Fujitsu ductless mini-split with the wired controller. It comes shipped with the configuration to use the indoor unit sensor not the t-stat sensor. See EN-5 page of the compact cassette...
  38. Replies
    37
    Views
    7,133

    condensor motors

    Has any one experienced condensor fan motor failures on these 30rba units? We have a 250 and a 125 and have lost about 12 motors. Failure mode is always bearing failure which then causes rotor to...
  39. Replies
    14
    Views
    2,338

    ISE

    Are these equations really accurate in the real world?:putergreet:
  40. Replies
    3
    Views
    1,461

    Floating is best

    I have always floated ALL inputs. NEVER take to chassis or electrical ground.
    Thanks. Mike
  41. Replies
    1
    Views
    467

    LNS plugin for Veris 8920-3

    :putergreet:Does anyone have a LNS plug-in for the Veris 8920-3 Modbus to Lon integrator. I know Veris doesn't support it any more and I can't get it from their website. TIA Mike
  42. Replies
    11
    Views
    3,482

    Either will work well. Floating control takes 2...

    Either will work well. Floating control takes 2 DO's where modulating takes 1 AO. Float control motors only use energy when moving. Modulating uses energy all the time. Your choice, but remember...
  43. Replies
    3
    Views
    862

    Communicating???

    I don't believe that these are communicating t'stats.
  44. Replies
    31
    Views
    1,926

    Math

    2 gigabit = 256m bytes(128M+128M)::putergreet:
  45. Replies
    9
    Views
    3,454

    EBi

    As said before, use the help files. I put in my first EBi in 2000 without any schooling, but with 30 years experience of HW systems. EBi, as said, is so powerful that its mind-boggling. However,...
  46. Replies
    1
    Views
    1,437

    HMMMMMM

    And then the fight started.:censored:
  47. Replies
    4
    Views
    1,851

    Ummm???

    And then the fight started:angel:
  48. Replies
    15
    Views
    3,427

    ????

    Tridium is Honeywell.:cheers:
  49. Replies
    6
    Views
    1,448

    Spare xl15b

    I have an extra one I would be willing to part whith, if you need it. Thanks. Mike
  50. Replies
    52
    Views
    5,322

    Works

    That's the way it should work!! You got it!!
Results 1 to 50 of 239
Page 1 of 5 1 2 3 4

Related Forums

Plumbing Talks | Contractor MagazineThe place where Electrical professionals meet.
Quality Home Comfort Awards