Search:

Type: Posts; User: simux

Page 1 of 16 1 2 3 4

Search: Search took 0.02 seconds.

  1. Replies
    9
    Views
    551

    It really looks like Easy IO systems are the way...

    It really looks like Easy IO systems are the way to go and all. Do they have distributers or will they sale the parts and software directly. Also how are the graphics?
  2. Replies
    62
    Views
    3,271

    Our maintenance staff gets 2 hours of comp time...

    Our maintenance staff gets 2 hours of comp time for each day of being on call plus time and a half for being called out.
  3. Replies
    7
    Views
    308

    I seem to remember that i had to upload my NCMs...

    I seem to remember that i had to upload my NCMs after I made any changes so GPL could find the points.
  4. Replies
    4
    Views
    177

    You could search the GPL or JC basic files to see...

    You could search the GPL or JC basic files to see if a point is shared to a point.
  5. Thread: NCM Battery

    by simux
    Replies
    8
    Views
    1,110

    The NCM will only reload if there are no errors...

    The NCM will only reload if there are no errors in the database. Been there, done that , got the t-shirt!!!
  6. Replies
    10
    Views
    318

    Sometimes sites have controllers that are not...

    Sometimes sites have controllers that are not supported by an NAE. For example if you have DCM's then you are tied to an NCM,
  7. Replies
    14
    Views
    574

    What about using NCMs with PMI?

    What about using NCMs with PMI?
  8. Replies
    7
    Views
    308

    There's also an option to generate a bas file I...

    There's also an option to generate a bas file I think. Then you can look at the code in jc basic.
  9. Replies
    14
    Views
    574

    What do you use to commission these new...

    What do you use to commission these new controllers and how do they map into PMI???
  10. Replies
    65
    Views
    6,775

    Would definately stay away from this scenario....

    Would definately stay away from this scenario. The XBS and EBI don't tend to play well together. I can't wait to rip all the controllers out and start from scratch!!!!
  11. Replies
    2
    Views
    152

    I remember they put those controllers in boilers....

    I remember they put those controllers in boilers. Anyways get a http://www.kele.com/transducers/res-1e.aspx and you can use a 0 - 10 volt signal to control the 135 ohm controller..
  12. Thread: Modem Config

    by simux
    Replies
    7
    Views
    263

    If its to communicate with an older controller...

    If its to communicate with an older controller you probably need to be on a certain comm port, usually com 1 or 2.
  13. Replies
    10
    Views
    318

    Also I agree with BillControls about the layering...

    Also I agree with BillControls about the layering of an NAE on top of a NCM. Then you have to know both systems and troubleshooting is more difficult.
  14. Replies
    10
    Views
    318

    Smoke control processes can be an issue depending...

    Smoke control processes can be an issue depending on different factors.
  15. Replies
    29
    Views
    1,183

    I would totally go that route, just make sure you...

    I would totally go that route, just make sure you can send the NAE back if it doesn't work. You could configure the new controller on the N-2 buss and then put back the old NAE until your finished....
  16. Replies
    20
    Views
    770

    What year is the generator. Back in the day we...

    What year is the generator. Back in the day we had issues with shielding generators causing interference with electronics. Sometimes you could provide a better ground for the gen set and it would get...
  17. Replies
    13
    Views
    608

    I've seen distances of N-2 busses that would...

    I've seen distances of N-2 busses that would stagger the mind and still work. Although I've had to make sure the shielding was correct and the distance between controllers not be too great. I would...
  18. Replies
    7
    Views
    546

    I also think most people moved on from pneumatics...

    I also think most people moved on from pneumatics but quite a few people still respond to pneumatic questions. I thought maybe Honeywell prohibited their people from Hvac-Talk.
  19. Replies
    7
    Views
    546

    I was under the impression that there were quite...

    I was under the impression that there were quite a few Honeywell systems installed all over the country in the 80's.
  20. Replies
    7
    Views
    546

    Sure

    I just noticed we don't have the number of reponses on Honeywell that we do from other manufacturer lines. Then of course the conspiracy theory in me took over and I asked the question.
  21. Replies
    7
    Views
    546

    Controls Representation

    I was wondering about the talent we have on HVAC Talk. It seems to me that pneumatics is well represented along with Johnson, Seimens, Trane etc... I was wondering about Honeywell, the "Big Red". It...
  22. http://necc-controls.com/vav/kreuter-pneumatic-vav...

    http://necc-controls.com/vav/kreuter-pneumatic-vav.html
  23. Someone probably took out the reverse reset...

    Someone probably took out the reverse reset volume regulator. This part reverses the signal and lets you set the minimum and maximum air flows
  24. Thread: Honeywell Guru's

    by simux
    Replies
    2
    Views
    292

    366351

    366351
  25. Thread: Honeywell Guru's

    by simux
    Replies
    2
    Views
    292

    Honeywell Guru's

    When we go into EBI alarm management of a R-7044 analog input, the alarm point value is shown as red dashes.
Results 1 to 25 of 397
Page 1 of 16 1 2 3 4