Search:

Type: Posts; User: ahimonkey

Search: Search took 0.01 seconds.

  1. Replies
    101
    Views
    11,003

    Re: Ahimonkey

    Yep, for a plumbing job. The first guy who came out told me the job required the floor to be ripped up and it would be at least $800. I could tell he was lying. Some people just can't lie...
  2. Replies
    101
    Views
    11,003

    The short version: If the client is an engineer...

    The short version:
    If the client is an engineer or has that mentality, send one of your more experienced install techs. You'll probably get the business because everyone would rather hire someone...
  3. Thank you for taking the time to reply. ...

    Thank you for taking the time to reply.



    The original builders apparently didn't have that problem. The suction line is "insulated" by about 3/8" of foam, (the liquid line is bare) but am I...
  4. After modeling our Dallas, TX house in HVAC-calc...

    After modeling our Dallas, TX house in HVAC-calc determined we need to offset 45000 BTUH in heat gain on a 1900 sqft 1967-built house. Slab foundation, story and a half (second is under steeply...
Results 1 to 4 of 4
Comfortech Show Promo Image

Related Forums

Plumbing Talks | Contractor Magazine
Forums | Electrical Construction & Maintenance (EC&M) Magazine
Comfortech365 Virtual Event