Search:

Type: Posts; User: dginid

Search: Search took 0.02 seconds.

  1. Replies
    8
    Views
    1,095

    Actually, the system is an open loop off of the...

    Actually, the system is an open loop off of the well.
  2. Replies
    8
    Views
    1,095

    "If the first stage is bigger or almost as much...

    "If the first stage is bigger or almost as much as your cooling load. 2 stage doesn't matter."

    Then I guess I'm quite oversized for cooling w/ either a 5 or 6 ton...

    So if my required cooling...
  3. Replies
    8
    Views
    1,095

    Thanks so much for the replies. This unit is a...

    Thanks so much for the replies. This unit is a Water Source heat pump from the well, so extra cost in piping etc is not an issue. The only issue is the size if the unit. The difference in cost...
  4. Replies
    8
    Views
    1,095

    Geothermal Sizing

    My HVAC contractor is soon to install a Bryant/Climatemaster Geothermal heat pump. He says I can go with either a 5 or 6 ton size because I'm between sizing.

    Calculated Heating load = 59,500...
Results 1 to 4 of 4

Related Forums

Plumbing Talks | Contractor MagazineThe place where Electrical professionals meet.
Comfortech 365