Search:

Type: Posts; User: jermrief

Search: Search took 0.01 seconds.

  1. Replies
    3
    Views
    597

    Sorry, 800' was stuck in my head because that's...

    Sorry, 800' was stuck in my head because that's how long per roll. So we would run 200' out and 200' back per ton. And should be able to do two loops per roll of piping.
  2. Replies
    3
    Views
    597

    Geothermal for underground Data Center

    Hello, I'm in the beginning design and research phase of buying a former communications underground bunker and running our server backup data center there. The location is in the midwest and the...
  3. Most efficient AC unit available for Central Florida

    Hello,
    We are in the process of building a 60'x120'x16' metal building for our personal shop in Central Florida. We plan on insulating and cooling to 76-80 degrees. We won't heat in the "winter". ...
Results 1 to 3 of 3
Comfortech Show Promo Image

Related Forums

Plumbing Talks | Contractor Magazine
Forums | Electrical Construction & Maintenance (EC&M) Magazine
Comfortech365 Virtual Event