Search:

Type: Posts; User: techguy35

Search: Search took 0.01 seconds.

  1. Thread: Metasys UNT

    by techguy35
    Replies
    1
    Views
    1,234

    I have a UNT that recieves inputs from a VMA via...

    I have a UNT that recieves inputs from a VMA via N2. If the UNT cycles the compressors during the day but does not cycle them at night due to low load the first time cooling is called for in the day...
  2. Replies
    14
    Views
    2,639

    You are forgetting about your other inductor the...

    You are forgetting about your other inductor the relay, use an MOV on all of your inductors and you should be fine.
  3. Thread: Tools

    by techguy35
    Replies
    2
    Views
    2,353

    I was wondering if there were any tools for...

    I was wondering if there were any tools for installing controls that a person should not or cannot live without, besides the basic hand tools?
  4. Replies
    8
    Views
    2,592

    Crab Master, I have MSN messenger. Addy is my...

    Crab Master, I have MSN messenger. Addy is my user name at comcast.net.
  5. Replies
    8
    Views
    2,592

    I have learned that, the facility terminal is...

    I have learned that, the facility terminal is direct connected to a 78010 host link, which in turn is connected to a 7805 dial link which is then connected to a modem. The dial link is dialing to...
  6. Replies
    8
    Views
    2,592

    We have picked up a monitoring contract for this...

    We have picked up a monitoring contract for this site with a new controls option phase in. Our local CSI rep did not do them justice and asked us to help them. We have other CSI Sites that we can...
  7. Thread: TCON101

    by techguy35
    Replies
    1
    Views
    1,609

    I must have asked my question improperly, is...

    I must have asked my question improperly, is there a source I can access all TCON Doc's?
  8. Replies
    8
    Views
    2,592

    I have spent the last eight years working for a...

    I have spent the last eight years working for a unit manufacturer,and have recently started working for a controls service company. We have aquired a building with inet 2000 system, I cannot connect...
  9. Replies
    7
    Views
    1,971

    I have found the suggestion from others through...

    I have found the suggestion from others through the search feature, my question however is PMs within first year, or how soon after startup would you expect a PM to be required.
  10. Replies
    7
    Views
    1,971

    I am wonder when a P.M. should be done on first...

    I am wonder when a P.M. should be done on first year equipment and what should be included.
Results 1 to 10 of 11