Search:

Type: Posts; User: HINDUSTANI

Search: Search took 0.00 seconds.

  1. Replies
    0
    Views
    1,042

    TRANE Chiller - RTHD SOLID STATE STARTER

    I need your technical suggestions to rectify the below problem, I would like to brief here shortly.
    When we commissioned the RTHD chiller with solid state starter ( Chaina make) chiller it was...
  2. Replies
    42
    Views
    4,272

    All our systems are closed loop operation for...

    All our systems are closed loop operation for comfort cooling.
    Most of the failures are during the project times. (untill the condition not matching the required Trane commissioning specifications,...
  3. Replies
    42
    Views
    4,272

    Yes your right. but a small change - regarding...

    Yes your right. but a small change - regarding the No flow (the flow switch is in line). my findings is inadequate flow.
    All the damages (I am not able to openly disclose the number of chillers)...
  4. Replies
    42
    Views
    4,272

    sorry. pleae read the 12.30 posted statement.

    sorry. pleae read the 12.30 posted statement.
  5. Replies
    42
    Views
    4,272

    cool........ Pump operation through the CH-530...

    cool........
    Pump operation through the CH-530 is very simple. Timer controlled ON/OFF operation with the help of a relay and in addition when ever the temperature fall at or below the freeze...
  6. Replies
    42
    Views
    4,272

    The operation sequence is - 1. Once the chiller...

    The operation sequence is - 1. Once the chiller in start command (whether in Local or in Remote Mode),
    2. After few seconds, the motorized valve opens.
    ...
  7. Replies
    42
    Views
    4,272

    T

    T
  8. Replies
    42
    Views
    4,272

    Totally Factory wired. The Pumps are not rooted...

    Totally Factory wired.
    The Pumps are not rooted through the CH-530. Why because - our climatic condition is always hot. My understanding is - this pump operation through the CH-530 is Exclusively...
  9. Replies
    42
    Views
    4,272

    Regarding the power - With in 60 Seconds power...

    Regarding the power - With in 60 Seconds power resumes with the DG.
    Regarding the Barrel heaters - for 44 degree F set point operation, it takes more time to raise the temperature of the Evaporator...
  10. Replies
    2
    Views
    722

    Model number required.

    Model number required.
Results 1 to 10 of 12
Comfortech Show Promo Image

Related Forums

Plumbing Talks | Contractor Magazine
Forums | Electrical Construction & Maintenance (EC&M) Magazine
Comfortech365 Virtual Event