crab master
02-08-2006, 10:16 PM
The boiler room panel.
http://img149.imageshack.us/img149/6480/suc50020small1im.jpg
Also the Vision 3 panel was not our part of the job - so the blue cable you see hanging down was done by another contractor - that of course was caught so now the blue cable is no longer there. Also yes there is a dent at the top middle of the panel - our guy dropped it when he was mounting it.
http://img442.imageshack.us/img442/6105/suc50096small8dj.jpg
The only thing that sucks with this one is they changed at the last minute where I was putting the webserver - the device on the far right. Otherwise I would have made more room for it in the panel so things across the top weren't so tight.
http://img442.imageshack.us/img442/9647/suc50095small5kz.jpg
http://img424.imageshack.us/img424/8048/suc50022small9xx.jpg
Here I've got my terminations for the Lon network FT/TP-10, Each transformers 24VAC power, and they all share a common common.
http://img154.imageshack.us/img154/3186/suc50034small4jj.jpg
Here's the Aaon rooftop we had to fit a controller into.
http://img154.imageshack.us/img154/5816/suc50035small3xh.jpg
Here's a close up of the controller and the freeze reset. It's too hard to read but the Freeze Reset reads "T.A.C 302 output K4 will have 24vac between K4 and ground when tripped."
BTW - Joey791 - mine are wired. JK - you did a nice job cutting in the front display and on the guts.
[Edited by Crab Master on 02-08-2006 at 10:27 PM]
http://img149.imageshack.us/img149/6480/suc50020small1im.jpg
Also the Vision 3 panel was not our part of the job - so the blue cable you see hanging down was done by another contractor - that of course was caught so now the blue cable is no longer there. Also yes there is a dent at the top middle of the panel - our guy dropped it when he was mounting it.
http://img442.imageshack.us/img442/6105/suc50096small8dj.jpg
The only thing that sucks with this one is they changed at the last minute where I was putting the webserver - the device on the far right. Otherwise I would have made more room for it in the panel so things across the top weren't so tight.
http://img442.imageshack.us/img442/9647/suc50095small5kz.jpg
http://img424.imageshack.us/img424/8048/suc50022small9xx.jpg
Here I've got my terminations for the Lon network FT/TP-10, Each transformers 24VAC power, and they all share a common common.
http://img154.imageshack.us/img154/3186/suc50034small4jj.jpg
Here's the Aaon rooftop we had to fit a controller into.
http://img154.imageshack.us/img154/5816/suc50035small3xh.jpg
Here's a close up of the controller and the freeze reset. It's too hard to read but the Freeze Reset reads "T.A.C 302 output K4 will have 24vac between K4 and ground when tripped."
BTW - Joey791 - mine are wired. JK - you did a nice job cutting in the front display and on the guts.
[Edited by Crab Master on 02-08-2006 at 10:27 PM]