View Full Version : another week at 911



billygoat22
08-05-2005, 06:10 PM
Got a bit more work done this week. Set three a/hs, finished the duct for units in mech room. Pics don't to that mass of duct justice, looks like its tied in a big knot! May try a shot from floor.

http://www.imagewiz.net/usr/hvac1/14852_911_032.jpg

refer lines are all guy I work with, I did some tricky fitting together of duct meanwhile.
http://www.imagewiz.net/usr/hvac1/14853_911_033.jpg


Stared this Thursday, 10ish today he finished the lines inside and came out to run some piping.

http://www.imagewiz.net/usr/hvac1/14854_911_030.jpg

Knew this corner was going to give me trouble from day one

http://www.imagewiz.net/usr/hvac1/14855_911_031.jpg

hvac hero
08-05-2005, 06:34 PM
Very nice job. I loved how neat that copper runs through the wall. Too bad they dont let yall use a half inch liner on the inside of that duct. All the prints we go by require that. Very nice job.

billygoat22
08-05-2005, 06:36 PM
I was looking at those return boxes when I put them in and thinking, that'll be tore up in no time.

Prints call for 2" wrap throughout the building.

BaldLoonie
08-05-2005, 08:40 PM
Better get them chained down so you don't lose them :D

square2round
08-05-2005, 08:55 PM
Nice job. Very nice.

billygoat22
08-05-2005, 10:11 PM
They should be safe. Bolted down the minisplits and the condensors are brazed in. GC wanted units on site a week ago and took responsibility for any theft.




Jail and courthouse are right next door so plenty of "heat" coming and going all the time.

mayguy
08-05-2005, 10:38 PM
Looks good.. This a Heat Pump system?


Like to see the pix when you are all done!

joker1
08-06-2005, 08:52 AM
Whats that lone 3/8 line above the other line sets?

Jultzya
08-08-2005, 12:48 AM
The last two LL's are not done, so I take it that line is the next LL to be getting installed.

Nice looking job!