08-28-2009, 07:30 PM
Hi, I've gotten 3 quotes for installing a vertical loop system (WaterFurnace Envision 3-ton).
Company A says it will do 3 x 150' wells.
Company B says it will do 3 x 155' wells.
Company C says it will do 3 x 185' wells (and says their calculations show 150' is not enough).
I asked Company B (the current low bidder...which I know isn't always the best) if they would go deeper and they said they would be willing to go deeper on the 3rd well to 225' (with no additional cost).
So 2 questions:
1) Is it okay if 1 well is deeper than the other 2? (would it affect flow, be harder on the pump, reduce efficiency, etc...)
2) Is there any way for me to know for sure that they drilled the 3rd well 225' instead of just 155'?
Thanks for your time,
Jim
Company A says it will do 3 x 150' wells.
Company B says it will do 3 x 155' wells.
Company C says it will do 3 x 185' wells (and says their calculations show 150' is not enough).
I asked Company B (the current low bidder...which I know isn't always the best) if they would go deeper and they said they would be willing to go deeper on the 3rd well to 225' (with no additional cost).
So 2 questions:
1) Is it okay if 1 well is deeper than the other 2? (would it affect flow, be harder on the pump, reduce efficiency, etc...)
2) Is there any way for me to know for sure that they drilled the 3rd well 225' instead of just 155'?
Thanks for your time,
Jim