atmosphere
04-26-2008, 09:48 AM
I have a tower fill replacement in an older Evapco tower that has had at least one fill replacement in the past.
There is no cat walk or rail around the top, only a ladder up the back.
I am thinking of a couple of scissor lifts to do the job, and maybe having a small crane on site to handle the in and out of the fill-safer and quicker.
Any ideas or cautions would be appreciated.
Thanks.
There is no cat walk or rail around the top, only a ladder up the back.
I am thinking of a couple of scissor lifts to do the job, and maybe having a small crane on site to handle the in and out of the fill-safer and quicker.
Any ideas or cautions would be appreciated.
Thanks.