otto
12-27-2007, 08:55 AM
12 hours yesterday. First call, check 6 RTU's in a previously unoccupied space. 2 of them have bad inducers. Got that fixed. Then I come to this beast. Seems like the mud daubers were making a condominium complex.
http://i140.photobucket.com/albums/r14/ottoz24/Lowe002.jpg
http://i140.photobucket.com/albums/r14/ottoz24/Lowe004.jpg
So after 3 hours or so of poking, prodding, vacuuming with 3 extensions on the shop vac. I finally get it all back together.
Then I get a no cooling call. Large WIC and a condenser that lost 28# of 404A. Busted cap tube on the LP control. New control with 1/4" flare tubing. Evacuate and recharge.
Last call, there until 8:30 PM. Steam boiler with a bad R&D control. Also needs a new return line vent for 1/2 the building. Write it up, gather all tools, close door........where is my service ticket holder???? Of course, it's on top of the boiler in the locked room. I had to wait 45 minutes for someone to come let me in.
:mad::mad::mad:
http://i140.photobucket.com/albums/r14/ottoz24/Lowe002.jpg
http://i140.photobucket.com/albums/r14/ottoz24/Lowe004.jpg
So after 3 hours or so of poking, prodding, vacuuming with 3 extensions on the shop vac. I finally get it all back together.
Then I get a no cooling call. Large WIC and a condenser that lost 28# of 404A. Busted cap tube on the LP control. New control with 1/4" flare tubing. Evacuate and recharge.
Last call, there until 8:30 PM. Steam boiler with a bad R&D control. Also needs a new return line vent for 1/2 the building. Write it up, gather all tools, close door........where is my service ticket holder???? Of course, it's on top of the boiler in the locked room. I had to wait 45 minutes for someone to come let me in.
:mad::mad::mad: