Greetings all.
I am about to purchase a 1910 side hall colonial in Westchester NY (Mamaroneck). Currently there is no A/C. It has Gas/Steam radiator heat with a hot water spur to a single floor addition that was built in 1984. I am sure that there is no insulation in the main house (walls or attic) and the windows are either original or cheap vinyl. The front of the home faces NE. There are 13 windows upstairs and 19 windows on the 1st floor. The house is 2800 sqf. 2nd floor is 1150 sqf and the 1st floor is 1650 sqf of which 500 is the 27X17 addition
My plan is to do a lot of work before I move in. I plan to have all the walls insulated as well as the attic. I plan on replacing most of the windows with new Andersons (new construction).
So, now the questions;
I want to put in dual zones into the house. The contractor is recommending qty. 2 2.5 Ton American Standard 14 Seer Air Handler Mod. 4TEE3F31 and qty 2 2.5 Ton American Standard 14 Seer Condensing Unit Mod. 4A7A4030. Keep in mind I might add on 300sqf on the 2nd floor one day.
He is trying to talk me in to Hydro Air. Currently I have single zone heating. What would the cost benefit be by going from single zone steam to dual zone hydro air? He says I can modify the existing Weil-McLain (200k BTU and 79 AFUE) or just replace it.
I plan on being on the house for a long time. Is it worth going the hydro toute? Will there be a cost savings? Are there any options that are a MUST have (humidifier, air cleaner etc) BTW, I have a dog and twin 18 month old boys.
Thoughts? Opinions? quote below
J
14 SEER 410A VARIABLE SPEED A/C WITH HYDRO AIR SYSTEM
FIRST FLOOR:
-Supply and install (1) 2.5 Ton American Standard 14 Seer Air Handler Mod. 4TEE3F31
-New Air Handler will be installed in basement on vibration isolators
-Supply and install (1) 2.5 Ton American Standard 14 Seer Condensing Unit Mod. 4A7A4030
-New condenser will be located outside on A/C pad
-Supply and install (1) Hydro coil with temperature control
-Supply and Install all necessary refrigerant piping to be run to Air Handler
-Supply and Install E-Z Trap condensate drain line that will run outside of house
-We will fabricate and install supply and return air trunk ducts of galvanized sheet metal of
Proper gauge and size
-Supply and install necessary air diffusers
-Supply and install (1) Touch screen Digital programmable thermostat
-We will install (1) Central return (location to be determined)
-We will install branch take offs of round pipe and flexible ducts
-New ductwork will be insulated with R-4 insulation
-New trunk duct will be internally lined with ½” internal lining for the first 6 feet
-Supply and install take offs with balancing dampers
-Start up and check test of operation
-5 year manufacturers warranty on all functional parts
-10 year manufacturers compressor warranty
14 SEER 410A VARIABLE SPEED A/C SYSTEM
SECOND FLOOR:
-Supply and install (1) 2.5 Ton American Standard 14 Seer Air Handler Mod. 4TEE3F31
-New Air Handler will be installed in attic on vibration isolators
-Supply and install (1) 2.5 Ton American Standard 14 Seer Condensing Unit Mod. 4A7A4030
-New condenser will be located outside on A/C pad
-Supply and install (1) Hydro coil with temperature control
-Supply and Install all necessary refrigerant piping to be run to Air Handler
-Supply and Install E-Z Trap condensate drain line that will run outside of house
-We will install secondary drain pan with safety switch
-We will fabricate and install supply and return air trunk ducts of galvanized sheet metal of
proper gauge and size
-Supply and install necessary air diffusers
-We will make all necessary control wiring connections
-Supply and install (1) Touch screen Digital programmable thermostat
-We will install (1) Central return (location to be determined)
-We will install branch take offs of round pipe and flexible ducts
-New ductwork will be insulated with R-4 insulation
-New trunk duct will be internally lined with ½” internal lining for the first 6 feet
-Supply and install take offs with balancing dampers
-Start up and check test of operation
-5 year manufacturers warranty on all functional parts
-10 year manufacturers compressor warranty
Basement:
-Supply and install conversion kit from steam to hot water
-Supply and install zone control panel
-We will run hydro piping for 1st and 2nd floor zone
-We will install supply and return header on boiler
-We will make final hydro piping to boiler
-Supply and install (2) circulator pumps (for 1st and 2nd Fl zone)
-We will make necessary controls and install valves
-We will make all necessary control wiring connections
-Start up and check test of operation
Total investment cost for the above proposed work will be…….
*All pricing valid for 30 days
Total investment cost for the above proposed work with new boiler will be…….
*All pricing valid for 30 days
Not included:
-Electrical, control wiring, plumbing, permits and relocation of any existing obstructions.
I am about to purchase a 1910 side hall colonial in Westchester NY (Mamaroneck). Currently there is no A/C. It has Gas/Steam radiator heat with a hot water spur to a single floor addition that was built in 1984. I am sure that there is no insulation in the main house (walls or attic) and the windows are either original or cheap vinyl. The front of the home faces NE. There are 13 windows upstairs and 19 windows on the 1st floor. The house is 2800 sqf. 2nd floor is 1150 sqf and the 1st floor is 1650 sqf of which 500 is the 27X17 addition
My plan is to do a lot of work before I move in. I plan to have all the walls insulated as well as the attic. I plan on replacing most of the windows with new Andersons (new construction).
So, now the questions;
I want to put in dual zones into the house. The contractor is recommending qty. 2 2.5 Ton American Standard 14 Seer Air Handler Mod. 4TEE3F31 and qty 2 2.5 Ton American Standard 14 Seer Condensing Unit Mod. 4A7A4030. Keep in mind I might add on 300sqf on the 2nd floor one day.
He is trying to talk me in to Hydro Air. Currently I have single zone heating. What would the cost benefit be by going from single zone steam to dual zone hydro air? He says I can modify the existing Weil-McLain (200k BTU and 79 AFUE) or just replace it.
I plan on being on the house for a long time. Is it worth going the hydro toute? Will there be a cost savings? Are there any options that are a MUST have (humidifier, air cleaner etc) BTW, I have a dog and twin 18 month old boys.
Thoughts? Opinions? quote below
J
14 SEER 410A VARIABLE SPEED A/C WITH HYDRO AIR SYSTEM
FIRST FLOOR:
-Supply and install (1) 2.5 Ton American Standard 14 Seer Air Handler Mod. 4TEE3F31
-New Air Handler will be installed in basement on vibration isolators
-Supply and install (1) 2.5 Ton American Standard 14 Seer Condensing Unit Mod. 4A7A4030
-New condenser will be located outside on A/C pad
-Supply and install (1) Hydro coil with temperature control
-Supply and Install all necessary refrigerant piping to be run to Air Handler
-Supply and Install E-Z Trap condensate drain line that will run outside of house
-We will fabricate and install supply and return air trunk ducts of galvanized sheet metal of
Proper gauge and size
-Supply and install necessary air diffusers
-Supply and install (1) Touch screen Digital programmable thermostat
-We will install (1) Central return (location to be determined)
-We will install branch take offs of round pipe and flexible ducts
-New ductwork will be insulated with R-4 insulation
-New trunk duct will be internally lined with ½” internal lining for the first 6 feet
-Supply and install take offs with balancing dampers
-Start up and check test of operation
-5 year manufacturers warranty on all functional parts
-10 year manufacturers compressor warranty
14 SEER 410A VARIABLE SPEED A/C SYSTEM
SECOND FLOOR:
-Supply and install (1) 2.5 Ton American Standard 14 Seer Air Handler Mod. 4TEE3F31
-New Air Handler will be installed in attic on vibration isolators
-Supply and install (1) 2.5 Ton American Standard 14 Seer Condensing Unit Mod. 4A7A4030
-New condenser will be located outside on A/C pad
-Supply and install (1) Hydro coil with temperature control
-Supply and Install all necessary refrigerant piping to be run to Air Handler
-Supply and Install E-Z Trap condensate drain line that will run outside of house
-We will install secondary drain pan with safety switch
-We will fabricate and install supply and return air trunk ducts of galvanized sheet metal of
proper gauge and size
-Supply and install necessary air diffusers
-We will make all necessary control wiring connections
-Supply and install (1) Touch screen Digital programmable thermostat
-We will install (1) Central return (location to be determined)
-We will install branch take offs of round pipe and flexible ducts
-New ductwork will be insulated with R-4 insulation
-New trunk duct will be internally lined with ½” internal lining for the first 6 feet
-Supply and install take offs with balancing dampers
-Start up and check test of operation
-5 year manufacturers warranty on all functional parts
-10 year manufacturers compressor warranty
Basement:
-Supply and install conversion kit from steam to hot water
-Supply and install zone control panel
-We will run hydro piping for 1st and 2nd floor zone
-We will install supply and return header on boiler
-We will make final hydro piping to boiler
-Supply and install (2) circulator pumps (for 1st and 2nd Fl zone)
-We will make necessary controls and install valves
-We will make all necessary control wiring connections
-Start up and check test of operation
Total investment cost for the above proposed work will be…….
*All pricing valid for 30 days
Total investment cost for the above proposed work with new boiler will be…….
*All pricing valid for 30 days
Not included:
-Electrical, control wiring, plumbing, permits and relocation of any existing obstructions.