cleancondenser
09-22-2006, 08:36 AM
I have a site with two UNT controllers, eachcontrolling a five ton package unit .
The UNT's are difficult to get to.
The N2 bus is controlled by an NAE.
The building engineer does not have a laptop,
I want him to be able to adjust setpoints and occupied periods
I do not wish to rewire the UNTS
Can I add a Johnson TEC21 03-2 Thermostat with N2 Bus, Multi-stage
To the N2 bus ,power it up
and add the points to the NAE
I would like to use this as the interface device,but do not feel like removing wires from the B.O.
of the UNT and connecting them to the
TEC21
I am assuming that the points on the T-STAT are N-30 object types.
Can the NAEr
ead the output points on the TEC and
have the UNT still control the Packge unit.
Would it be easier, actually would it be about the same price, to connect a Zone Terminal Device instead.
Thank You
The UNT's are difficult to get to.
The N2 bus is controlled by an NAE.
The building engineer does not have a laptop,
I want him to be able to adjust setpoints and occupied periods
I do not wish to rewire the UNTS
Can I add a Johnson TEC21 03-2 Thermostat with N2 Bus, Multi-stage
To the N2 bus ,power it up
and add the points to the NAE
I would like to use this as the interface device,but do not feel like removing wires from the B.O.
of the UNT and connecting them to the
TEC21
I am assuming that the points on the T-STAT are N-30 object types.
Can the NAEr
ead the output points on the TEC and
have the UNT still control the Packge unit.
Would it be easier, actually would it be about the same price, to connect a Zone Terminal Device instead.
Thank You